Republic Services of New Jersey
Re-configuration of existing transfer station
Republic Services awarded Baker with the task of re-configuring an operating transfer station. This project included removing existing equipment foundations and installing a new axle scale. Constructing several hundred feet of structural steel push walls. Removal and replacement of transfer station floor. Re-constructing the roof structure of the building from damage that was previously done. Facility operations were seamless and Republic could not have been happier with the finish product. Completed: September 2011Project Services